HAESOL SMART FACTORY
Field-proven MES,
now with AI
Since 2010 we have implemented MES, WMS and HMI at semiconductor, auto parts, electronics, steel and chemical plants. We develop every layer in-house — from equipment data acquisition to production execution and AI queries — and connect it end to end.

- Founded
- 2010Manufacturing IT specialist
- In-house solutions
- 6From MES to AI Agent
- Overseas countries
- 7Americas · Asia · Europe
- Overseas projects
- 27Implementation · Enhancement · Integration
- Corporate R&D center
- 2013In-house R&D
SOLUTIONS
Six solutions to collect, execute and analyze manufacturing data
From MES and WMS to equipment integration and AI, Haesol develops all six solutions in-house and implements them directly.
Manufacturing execution system
fastMES
From production planning to production results, quality and shipping, fastMES manages shop-floor execution as lot-level history.
- Real-time production reportingOutput and defects totaled on the floor through kiosks, PDAs and equipment integration
- Lot traceabilityOperator, equipment and inspection history linked by lot from material receipt to shipment
- ERP integrationWork orders received and results reported back keep plans and shop-floor execution in step
- Today's orders18
- Avg. attainment82.4%
- Open orders3
- Bracket A-120100%Closed
- Housing B-31086%In progress
- Shaft D-21060%Locked
- Cover C-04553%In progress
Manufacturing execution for semiconductors & LEDs
Semiconductor MES
Manages wafer- and lot-level process flow, recipes, testing and yield to fit the fab environment.
- Process flow & lot controlStep-by-step routing, lot split and merge, holds and recipe validation
- Wafer & chip traceabilityTrace failing chips on the wafer map back to their process and tool history
- Test & yield analysisReal-time monitoring of probe test results and yield at each step
- Yield92.1%
- Good11,414
- Tested12,394
- BIN 1 Good92.1%
- BIN 2 Electrical5.2%
- BIN 7 Visual2.7%
Warehouse management system
fastWMS
Every scan in receiving, putaway, picking and shipping is tied to an inventory transaction and an ERP material document.
- PDA tasks on the floorReceiving, putaway, picking and loading handled by barcode scan
- Movement types & ERP postingEach stock movement gets a movement type and posts to ERP automatically
- FIFO & physical inventoryLot-based FIFO issue and adjustment of count variances
- Today's transactions1,284
- Posted to ERP99.8%
- Unposted2
- 101ReceiptReceiving dock → A-03-02+240Posted ✓
- 311TransferWarehouse 1 → Warehouse 2120Posted ✓
- 261To lineB-02-06 → Line 2−480Posted ✓
- 601DeliveryShipping dock → Customer A−600Posted ✓
- 551ScrapC-01-03 → Scrap warehouse−6Pending approval
Equipment monitoring & data acquisition
HMI
Collects and stores equipment data in real time and monitors line and equipment status on one screen.
- Real-time data acquisitionEquipment data over Modbus TCP and OPC UA, with Store & Forward to prevent data loss
- History in hs-RTDBHistorical trends and limit alarms to analyze the causes of abnormalities
- Web-based hs-HMIMonitoring screens on line and equipment layouts, with multilingual support
- Output / plan72%
- Defects48EA
- Run time6h 12m
- Last downtimeCoil change
Integrated dashboard
HiMB
An integrated dashboard that cross-references MES, WMS and ERP data to bring problems between departments to light early.
- Work center status & progressRunning status by work center and progress by product on one screen
- Line material shortagesSpot missing materials by line early and supply them ahead of time
- Inspection backlog & shippingSurface quality holds and inspection backlogs to prevent late deliveries

MES-based AI
AI Agent MESIA
MES-based AI that alerts first, reduces shop-floor input and answers with verified figures.
- AI briefings & delay detectionFlags production status and delivery-delay risks first and proposes actions
- Simpler shop-floor reportingField reports and job completion entered through conversation
- Answers with verified figuresIntent structuring → knowledge catalog → verified SQL → sources attached
PJ-2611 material receipt 5 days late — downstream schedule recalculated
AI suggested actions · delivery 9/2
- (a) Two-shift machining for 3 daysDelivery kept
- (b) Outsource first-stage machiningDelivery kept · higher cost
- (c) Agree delivery +3 days with customerDelivery changed
INTEGRATION
From equipment to AI, every layer linked
From equipment data acquisition to production execution, cross-department status and AI queries, one company designs, develops and implements it all.
- 01Equipment · PLCModbus TCP · OPC UAEquipment signals · Measurements
- 02HMI · hs-RTDBReal-time acquisition · Storage · MonitoringEquipment status · Running data
- 03MES · WMSProduction · logistics execution, lot history⇄ ERP plans · documentsLot · process · inventory results
- 04HiMBIntegrated status across systems · departmentsCross-department indicators
- 05AI AgentMESIA queries · Delay detectionBriefings · Suggested actions
Customer site · Existing systems
Designed, developed and implemented by Haesol HMI · MES · WMS · HiMB · AI Agent, all developed in-house
AI AGENT · MESIA
An MES-based AI that answers
with verified figures
AI Agent is not a separate chatbot window: it works beside the MES screen, looking at the same data as you. Figures come from the database, explanations from the LLM, and every answer is linked to its source records.
- 01Intent structuringInterprets the question as metric · dimension · time period
- 02Knowledge catalogLinks it to metric definitions and data structures
- 03Verified SQLRuns only verified SQL templates
- 04Sources attachedEvery answer comes with its source records
By default, processing runs on an on-premises LLM on GPU servers inside the customer's plant, and no data is sent to external general-purpose AI services.
Can we take one 500 t-class unit for end-of-October delivery?
InterpretedSimulated order 500 t-classStandard process templateCapacity recalculated by section
- (a) Bring PJ-2613 assembly forward 1 weekDelivery 10/29
- (b) Outsource first-stage machiningDelivery 10/25
QR nameplate scanned — EQ-2605 · 600 t tandem press
PhotoSlide assembly fastening
VoiceSlide assembly is done, hydraulic piping starts tomorrow
Schedule board updated
REFERENCES
From semiconductors to auto parts, proven on the shop floor
- Semiconductor · LEDWafer processing · Probe · Yield
- Auto partsPress · Injection molding · Molds · SMT · Assembly
- ElectronicsSMD mounting · Assembly · Inspection
- SteelIntegrated production · logistics
- ChemicalsBatch processes · Quality control
Recognition
View all certificationsAs a smart factory supplier, Haesol was selected as an excellent supplier case by Korea's Ministry of Trade, Industry and Energy.
- Excellent Technology Rating companyNICE Information Service · 2016
- Corporate R&D centerKOITA · 2013
- Venture businessKIBO · 2012
- Software copyright registrationHiMB 2021 · fastDBA 2020
GLOBAL
Across time zones,
every site stays connected
Mexico · USA · China · India · Vietnam · Malaysia · Serbia. Engineers at our headquarters remotely support the overseas sites where Haesol systems are in operation.
- Implemented in
- 7 countries
- Support locations
- 11 sites
- Overseas projects
- 27 projects
- Haesol HQSuwon
- ChinaWeihai · Qingdao · Wuxi · Wenzhou
- VietnamHo Chi Minh City
- MalaysiaPenang
- IndiaChennai · Pune
- SerbiaLeskovac
- USAGeorgia
- MexicoMonterrey
Times shown are local time at each site.
Remote support cases
India · Production KPIs
Target UPH calculated automatically- Ask
- Show the units-per-hour (UPH) target on the production dashboard based on the day's plan instead of a fixed input value
- Fix
- Changed the target UPH to be calculated from the day's order quantity and ERP (SAP) routing standard times
China · ERP integration
ERP goods receipt posting corrected- Ask
- A goods receipt posting created by an input error on the floor failed in the ERP
- Fix
- Cancelled the posting and reconciled MES and ERP goods receipt data
Mexico · Packing labels
Stronger BIN label scan validation- Ask
- Hard to tell on the floor why a packing label scan had failed
- Fix
- Separate alerts for duplicate barcodes, product mismatches and missing matching rules
SERVICE
From adoption to operation, one team sees it through
From on-site assessment through implementation, stabilization and improvement in operation, the same Haesol engineers carry the work forward.
- 01Assess
Process · logistics · quality assessment
Data acquisition maturity checkResultImprovement tasks · priorities
- 02Design
Target model · system architecture
Equipment · ERP interfacesResultPhased roadmap
- 03Implement
On-site implementation · equipment integration
ERP integration testingResultA system ready to run
- 04Stabilize
Pilot operation · training
KPI review · fine-tuningResultHandover to maintenance
- 05Operate & improve
Remote · on-site technical support
Preventive inspection · patches · upgradesResultImprovements → back to assessment
Improvements found in operation feed back into assessment
01 Assess – 04 Stabilize
Solution consulting
We assess on-site operations and data, define a target model and a phased roadmap, and carry implementation and stabilization through as one team.
- Industry-specific assessment
- ERP (SAP) integration design
- Korean government support programs
05 Operate & improve
Maintenance services
Remote and on-site technical support and scheduled preventive inspections keep implemented systems from stopping production, and improvement requests are delivered as patches and upgrades.
- Engineer notified on receipt
- Remote first · on site when needed
- Action history kept
